Saturday, May 25, 2013

River Park Buildings


Fresno, California

Work Performed:

  • Lath
  • Plaster
  • EIFS
  • Arcus Stucco
  • Exterior Metal Stud Framing
  • Plywood Sheathing
  • Pedestrian Control Barricades

Other Jobs at this location:

  • Tilly’s
  • Claires
  • Bed Bath & Beyond
  • Lasik
  • Rubios
  • GNC
  • Sur La Table

Project Manager: Shawn Curry

General Contractor: Michael R. Tolladay Corp.

Project Value: $10 Million

Job Sites Menu